The Greenhouse Project Process, from Concept to Commissioning
We plan new greenhouse investments and systems for existing facilities through needs assessment, engineering, implementation, testing and commissioning. Scope reflects the site, climate, area, crop, available infrastructure and selected systems.
The detail and sequence adapt to project scope, with each stage supplying the information needed for the next technical decision.
01
Initial Discussion and Needs Definition
We record location, approximate area, crop, current conditions and investment objectives.
02
Site, Climate and Infrastructure Assessment
The site or facility is assessed for climate, water, energy, access and usable infrastructure.
03
Defining Production Objectives
Crop, cultivation method, production period, capacity approach and automation expectations are clarified.
04
Concept Design and System Scope
The greenhouse type, layout, structure and general technical-system scope are prepared.
05
Technical Engineering and Proposal
Capacities, interfaces, controls, implementation scope and the commercial proposal are developed.
06
Production, Procurement and Site Preparation
Equipment preparation, manufacturing, procurement and site coordination follow the approved scope.
07
Installation and System Integration
The structure and technical systems are installed in sequence and connected.
08
Testing, Commissioning and Handover
Equipment, control signals and system interfaces are checked, and essential operating information is shared.
What Information Helps Us Get Started?
Not every item is mandatory for the first discussion. Missing technical information can be clarified during assessment.
Country and city
Project area or greenhouse dimensions
New facility or existing greenhouse
Crop to be grown
Soil, hydroponic or vertical growing preference
Water source and available analysis
Existing energy infrastructure
Systems required
Target project timing
Available site photos and technical drawings
What Shapes the Project Scope?
Technical scope is established by assessing these variables together; no fixed price or duration is assumed at this stage.
Site and land conditions
Layout, ground, access and available space affect engineering decisions.
Regional climate data
Temperature, humidity, wind and solar load shape system needs.
Crop
Crop and growth stage change climate, water and light targets.
Greenhouse area and structure
Dimensions, covering and volume define capacities and layout.
Water quality and capacity
Source, flow and analysis influence treatment and irrigation scope.
Energy source
Available electricity and heat sources are reviewed with system options.
Automation level
Zones, sensors, records and remote-access requirements are defined.
Local implementation and logistics
Access, local conditions and coordination enter the implementation plan.
Responsibility and Communication Throughout the Project
For work offered under the Agrotecta brand, ISITMAX uses a coordination approach intended to keep technical decisions traceable and responsibilities clear.
Clarifying technical scope in writing
Planning interfaces between systems together
Coordinating the implementation sequence
Assessing how changes affect scope
Checking testing and commissioning items
Maintaining regular project communication with the client
What Happens if the Scope Changes?
Needs may evolve as the project progresses. Their technical and commercial effects are reviewed before implementation.
1Changes to area, crop, capacity or requested systems trigger a new technical review.
2Effects on equipment, implementation, cost and schedule are clarified before work proceeds.
3Unapproved changes are not automatically considered part of the project scope.
Systems That May Form Part of Your Project
Each system may be assessed independently or as part of a connected project scope.
Turnkey Greenhouses
Coordinated structure and technical systems for a new facility.
Frequently Asked Questions About the Project Process
What information is needed to start a greenhouse project?
Location, approximate area, crop, cultivation method, existing infrastructure and required systems allow an initial assessment. Missing technical details can follow.
How is the project duration determined?
The schedule is prepared after reviewing scope, site readiness, equipment, procurement, implementation sequence and local conditions.
How is project cost calculated?
Cost follows clarification of dimensions, capacity, equipment, automation level, site work and implementation scope.
Can I request only one greenhouse system?
Yes. A single heating, irrigation, fertigation, LED or automation system can be engineered after checking compatibility with existing infrastructure.
Can my existing greenhouse be assessed and upgraded?
Yes. Suitable options can be identified after reviewing the structure, equipment, interfaces and available capacity.
Can the scope change during the project?
A requested change is assessed for technical, commercial and schedule effects; an approved revised scope can then proceed.
How are projects outside Türkiye assessed?
Location, climate, local implementation conditions, logistics and available site data are reviewed to define scope and coordination.
What is checked during testing and commissioning?
Equipment operation, field connections, control signals, scenarios and system relationships are checked against the approved scope.
LET’S PLAN YOUR PROJECT
Let’s Discuss Your Next Project
Share your requirements for a new greenhouse or an existing facility. Our technical team will contact you to develop a practical solution plan.